Skip to content
Drain and sump work books for dry weather. Finish carpentry runs all winter.
Monday – Friday: 7:30 a.m. – 4:30 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7:30 a.m. – 4:30 p.m.Lead-Safe Certified Firm (RRP) · MO Firm cert. no. 000000VerifyGeneral liability insurance
1 more license
  • Lead-Safe Certified Firm (RRP) · MO Firm cert. no. 000000Verify
  • General liability insurance
(816) 555-0104

Rooms

Finished rooms

The part you see, once the water is handled.

A family room, a bedroom, a bath, an office, a laundry. We plan each around where the drains, the pit and the windows already are.

What we build

  • Family rooms and media rooms

  • Bedrooms with egress

  • A bath or powder room, with a pit if the plumbing needs one

  • Offices and play rooms

  • Laundry and storage

Carpeted basement with wood paneling, a sliding door to the yard and a wood stove

What it doesn't include

Left out of this work

  • Furniture and appliances

    We build the room. You bring what goes in it.

  • Exterior work

    Outside work is its own line of the quote.

  • Rooms we haven't read

    We start finishing only after the moisture report.

What changes the cost

What moves the number

We price each job from a written scope. These are the things that make one house cost more than another.

  • 01

    A bathroom

    Plumbing below the sewer line needs a pit and a pump.

  • 02

    Ceiling height

    Low ceilings shape the layout.

  • 03

    Egress

    A bedroom needs a window that works as an exit.

  • 04

    Finishes

    Cabinets, tile and trim change the number most.

How it goes

From the first visit to the last

  • 01

    Plan

    Layout, egress and where the services run.

  • 02

    Build

    Frame, rough-in and inspect.

  • 03

    Finish

    Ceilings, floors, trim and paint.

  • 04

    Walk through

    We go room by room with you.

Permits and rules

Who pulls the permit

New rooms usually need a permit, and a bedroom needs egress. We tell you what your city requires before we quote and pull the permits for our work.

Questions

About this work

Can I add a bathroom?

Usually. If the drains are below the sewer line we use a pit and a pump.

How long does a whole basement take?

It depends on the water work. We give a schedule in the written plan.

Can I use the room as a bedroom?

If it has egress, ceiling height and the permits your city asks for.

Thinking about the rooms?

Tell us what you're seeing and we'll book the visit.